The Essential Rules of Quantity Surveying Measurements - Egbodo Benjamin

Breaking

Egbodo Benjamin — Entrepreneur • Cultural Curator • Creative Leader
Egbodo Benjamin

Founder & CEO of This Is Hip Hop HQ — a four‑time award‑winning global platform dedicated to empowering independent artists, preserving authentic hip‑hop culture, and amplifying creative voices across Africa and beyond.

Certified Project Manager, Fellow of the International Trade Council, and FOYA Africa Awards 2024 nominee for “Social Founder of the Year (Under 30).”

A dynamic blogger, youth advocate, and cultural curator committed to inspiring resilience, creativity, leadership, and purpose‑driven impact.

“Driven by vision, guided by discipline, and fueled by purpose — Benjamin continues to redefine excellence and shape the future of African creativity.”

Friday, November 28, 2025

The Essential Rules of Quantity Surveying Measurements

In construction, money doesn’t move until measurements do. Every cost plan, BOQ, valuation, interim payment, variation claim, and final account begins with a QS and a tape measure — or, these days, with digital take-off tools that make you feel like you’re handling the architectural equivalent of a DJ’s turntables.

But here’s the truth many young QSs don’t hear early enough: your entire reputation stands or falls on how well you measure. You can be charismatic, you can dress the part, you can speak like a courtroom advocate — but if your measurement is wrong, everything collapses under it like a poorly reinforced slab.

This masterclass is built to give you what textbooks don’t: the why, not just the what. Because every dimension has a consequence. Every quantity has a financial echo. Every mistake has a chain-reaction.




Why Measurement Matters — The Legal and Professional Angle

In construction law and contract administration, measurement isn’t just arithmetic. It is evidence. It is testimony. It is the QS’s sworn statement on what exists, what was built, and what should be paid.

Measurement matters because it serves as:

  1. A legally defensible baseline
    Under BESMM4 and most standard forms of contract, payment is based on measured work. If your quantities are wrong, your legal footing is weak.

  2. A shield against claims and disputes
    Accurate measurement protects the client. Wrong measurement hands the contractor a loaded weapon.

  3. A bridge between the drawing and the money
    Architects design. Builders execute. QSs translate. If that translation is faulty, the entire project becomes a courtroom waiting to happen.

  4. A reputational fingerprint
    In this industry, once you get tagged as “that QS who doesn’t deduct openings,” the stigma follows you like an unpaid debt.

Think of measurement the way a rapper thinks of rhyme structure — it’s the invisible skeleton holding the entire verse together.


The Golden Rules of Measurement

Call them commandments. Laws. Industry DNA. These are the rules every competent QS lives and dies by.

1. Consistency of Units

BESMM4 is unambiguous: use standard units.
Meters. Square meters. Cubic meters. Kilograms.
The minute you mix units, you’re inviting contractual catastrophe.

A consultant team once received a BOQ where blockwork was measured in feet and painting in meters. The client asked one question: Who hired these comedians?

2. Accuracy of Dimensions

Measure to the nearest 5 mm unless stated otherwise.

This is not an optional detail. It’s a professional obligation. Just as a DJ cannot be sloppy with BPM, a QS cannot be sloppy with dimensions.

3. Clarity of Description

“Block wall” means nothing.
“150 mm thick sandcrete block wall in cement-sand mortar (1:6) including all labour and materials” is a legally clear description.

Descriptions protect you when contractors attempt creative interpretations of specifications.

4. Separation of Work

Each trade measured on its own.
Plaster is not part of blockwork.
Painting is not part of plaster.
Formwork is not part of concrete.

Separation eliminates ambiguity and prevents double-payment.

5. Deduction Rules

BESMM4 requires deduction of openings greater than 0.5 m².
Anything smaller is treated as negligible.

Ignore this rule and you will pay dearly — in naira, credibility, and peace of mind.

6. No Duplication

One item means one measurement.
Double-counting is the QS equivalent of plagiarism — professionally fatal.

7. Waste Allowances

Construction is not a perfect science. Tiles break. Steel overlaps. Timber bends.
You must allow for waste, but legally defensible waste.
Not random guesswork.

8. Adherence to BESMM4

This is Nigeria’s legal and professional blueprint.
If you measure outside BESMM4, your BOQ is nothing more than decorative paper.


Methods of Measurement — With Technical Clarity

Center Line Method

Ideal for symmetrical buildings.
Saves time.
But you must adjust for junctions and intersections carefully.

Long Wall–Short Wall Method

Perfect for blockwork and brickwork.
Long walls measured out-to-out.
Short walls measured in-to-in.
This ensures overlaps are correctly represented.

Cross-Sectional Method

Used for earthworks.
You take sections at intervals, average them, and compute volumes.
This method is legally defensible because it mirrors real ground profiles.

Separate Item Method

Used for complex structures.
Each element stands alone.
Reduces ambiguity.
You’ll often find this method in high-rise BOQs, bridges, and infrastructural works.


BESMM4 — The Nigerian Standard You Must Live By

BESMM4 is not just a booklet. It’s the constitution.
It defines:

  • how to classify work

  • how to measure each trade

  • how to describe components

  • what units to use

  • what to deduct

  • what to include

No contractor or consultant can override BESMM4 without written agreement.
If they do, disputes become inevitable.

BESMM4 organizes building and engineering works into sections such as:

  • Preliminaries

  • Earthworks

  • Concrete

  • Blockwork

  • Roofing

  • Finishes

  • MEP

  • External works

  • Specialist installations

Once you understand these divisions, BOQs stop being intimidating and start being systematic.


Key Rules Every QS Must Tattoo on Their Brain

Rule of Accuracy

If you cannot measure accurately, you cannot defend your work legally.

Rule of Deduction

Anything above 0.5 m² must be deducted — or be ready for interrogation.

Rule of Description

Material. Thickness. Mix. Method. Finish.
Every description must read like a court affidavit — factual, clear, and unambiguous.

Rule of Precedence

Structure before finishes.
Core before cosmetics.

Rule of Waste

Waste is real, but waste must be justified.
Contractors love throwing “waste” around like seasoning.
QSs must control it with evidence.

Rule of Proportionality

Measurement must reflect reality.
A BOQ is not fiction.
It is a factual statement of what will exist on site.


Practical Examples — Expanded and Explained

Concrete

Concrete measured in cubic meters.
Formwork in square meters.
Reinforcement in kilograms or tonnes.

If you measure concrete and forget the formwork, prepare for embarrassment during tender queries.

Blockwork

A 10 m × 3 m × 0.23 m wall:
10 × 3 × 0.23 = 6.9 m³.

Door opening: 1.2 × 1.5 = 1.8 m².
Since it’s above 0.5 m², deduct it.

Painting

Painting is always in m².
Openings below 0.5 m² are ignored.
This is a BESMM4 rule — do not alter it.

Earthworks

Earthworks measured using cross-section.
You cannot use rule-of-thumb in this trade.
Courts will demand proof.


Common Mistakes by Young QSs — With Real Consequences

  1. Mixing units.

  2. Forgetting deductions.

  3. Poor documentation.

  4. Using SMM7 rules in a BESMM country.

  5. Over-measuring to look busy.

  6. Blind reliance on software outputs without verification.

A QS who cannot defend measurements is like a rapper who cannot explain their lyrics in court — vulnerable and exposed.


Case Studies — Expanded with Narratives and Site Drama

Case 1: The Overpaid Wall

A young QS measures all block walls but forgets to deduct 38 window openings.
Contractor gets overpaid by millions.
Client discovers it during site inspection.
The QS tries to explain, but nobody listens.
Meeting ends with reprimands, red faces, and a damage control plan.

Lesson: Deductions are not optional.

Case 2: The Feet vs Meters Disaster

A QS recently transferred from the US measures structural lengths in feet.
Everyone else works in meters.
When the BOQ arrives, reinforcement quantities appear inflated.
The contractor raises eyebrows.
The client raises blood pressure.
The BOQ is rejected.
The QS learns humility the hard way.

Lesson: Always check units.

Case 3: The Tile Wastage Drama

Contractor claims 20 percent wastage.
QS challenges it.
They walk to site.
Turns out tiles were being cut carelessly.
Behaviour corrected.
Wastage normalized to 5 percent.
Cost saved.

Lesson: Evidence beats assumptions.


Tips for Young Professionals

  • Always measure twice.

  • Use BESMM4 as your daily companion.

  • Never trust drawings blindly.

  • Confirm specifications.

  • Document everything.

  • Cross-check with site conditions.

  • Learn PlanSwift, CostX, Bluebeam.

The industry rewards precision and punishes negligence.


Closing Note

Measurement doesn’t trend on social media.
Nobody applauds accurate deductions.
But when things go wrong, your name will be the first on the table.

A QS survives on credibility.
That credibility begins with measurement.
So master it.
Defend it.
Practice it until it becomes instinct.

Because in construction, the measuring tape is not just a tool.
It is the QS’s badge of honour.