A Beginner’s Guide to Construction Take-Off Lists: From Site Setup to BOQ

For a fresh Quantity Surveying (QS) student, stepping onto a construction site can feel overwhelming. Soil is being dug, concrete is poured, workers move in rhythm — and behind it all, the QS must capture every activity in numbers.



This is where the take-off list comes in. It is the QS’s roadmap, breaking down construction into measurable parts. Think of it as the script of a play: every act (excavation, roofing, finishes) must be listed, measured, and priced. Without it, the project risks drifting into chaos.


Stage 1: Preliminaries — Setting the Stage

Before construction begins, the site must be prepared.

  • Site survey and setting out: marking boundaries and levels.
  • Clearing site: removing vegetation, debris, or old structures.
  • Temporary works: site office, storage sheds, toilets, fencing.
  • Utilities setup: water and electricity supply for construction.

Units to measure: lump sum (LS), square meters (m²) for clearing, number (nr) for temporary facilities.


Stage 2: Earthworks and Substructure — Digging Deep

This is the foundation of the building.

  • Excavation: trenches, pits, bulk earth removal.
  • Foundation concrete: blinding, strip/pad foundations, raft.
  • Reinforcement steel: cut, bend, fix.
  • Formwork: shaping concrete.
  • Backfilling and compaction: restoring soil stability.

Units to measure: cubic meters (m³) for excavation, kilograms (kg) for reinforcement, square meters (m²) for formwork.


Stage 3: Superstructure — Raising the Skeleton

The building begins to rise above ground.

  • Columns, beams, slabs: concrete, reinforcement, formwork.
  • Walls: block or brick masonry.
  • Staircases: structural connections between floors.

Units to measure: m³ for concrete, m² for walls, nr for staircases.


Stage 4: Roofing — Crowning Glory

The roof completes the skeleton.

  • Roof trusses: timber or steel.
  • Roof covering: tiles, sheets, shingles.
  • Rainwater goods: gutters, downpipes, fascia boards.

Units to measure: m² for roof covering, m for gutters, nr for trusses.


Stage 5: Finishes — Dressing the Building

This stage gives the building its personality.

  • Plastering: smooth walls.
  • Flooring: tiles, screed, terrazzo, wood.
  • Painting and decorating: internal and external.
  • Ceilings: gypsum, POP, timber.

Units to measure: m² for plastering, flooring, and ceilings.


Stage 6: Windows and Doors — Openings to the World

Every building needs access and light.

  • Windows: frames and glazing.
  • Doors: frames, panels, locks.
  • Ironmongery: hinges, handles, bolts.

Units to measure: nr (number of items).


Stage 7: Services — Bringing the Building to Life

Without services, a building is just a shell.

  • Plumbing: pipes, fittings, sanitary fixtures.
  • Electrical: wiring, switches, sockets, lighting.
  • Mechanical systems: HVAC, fire protection.

Units to measure: m for pipes and wires, nr for fixtures.


Stage 8: External Works — Completing the Picture

The outside environment matters too.

  • Paving: walkways, driveways.
  • Drainage: stormwater, septic, soakaway.
  • Boundary walls and gates: fencing, security.
  • Landscaping: plants, lawns, trees.

Units to measure: m² for paving, m for fencing, nr for gates and trees.


Stage 9: Final Activities — Curtain Call

The building is tested, cleaned, and handed over.

  • Testing and commissioning: plumbing, electrical systems.
  • Snagging: fixing defects.
  • Final cleaning: preparing for handover.

Units to measure: lump sum (LS).


Sample BOQ Table for Practice

Here is how a take-off list becomes a BOQ table.

Item No.Description of WorkUnitQuantityRateAmount
1.1Site clearingm²500——
1.2Temporary site officenr1——
2.1Excavation for foundationsm³120——
2.2Concrete blindingm³15——
2.3Reinforcement steelkg1,200——
3.1Block wallingm²220——
4.1Roof covering (aluminium)m²180——
5.1Internal plasteringm²400——
5.2Floor tilingm²150——
6.1Timber doorsnr12——
6.2Aluminium windowsnr18——
7.1Plumbing pipesm250——
7.2Electrical wiringm300——
8.1Paving (walkway)m²100——
8.2Boundary wallm60——
9.1Final cleaning and handoverLS1——

Closing Thought

As a QS student, remember: the take-off list is your storybook of construction. Each line item is a sentence, each unit is a word, and together they narrate the journey from bare soil to a finished building.

The more detailed your list, the clearer your BOQ, and the stronger your role as the quiet narrator behind the rise of every structure.